Friday consisted on buttoning miscellaneous things up on the deck: Caulking screw holes, cleaning out the wood scraps underneath, putting away tools that had filled up the riding mower's trailer. This project is done!
Showing posts with label Deck Building. Show all posts
Showing posts with label Deck Building. Show all posts
Saturday, October 11, 2008
Sunday, October 5, 2008
Steps Done!
We wrapped up the steps yesterday and no one is happier about it than I am. These steps mocked me, taking way longer than I had estimated! I don't remember the steps taking as long on my last deck, but then again that was a while back. There are a lot of little details that all take time on steps.
What's left on the deck? I have to caulk the white fascia joints / screw heads, clean-up under the deck, and put the tools away. After that, the next project will involve painting some rooms downstairs.
I took this picture (below) this morning. A hot air balloon flew over our house and landed in our neighbors yard. I hadn't realized it until I looked at the picture, but the chase van is driving past the barn.

Monday, September 29, 2008
Weekend Washout
The weather did not cooperate this past weekend and I didn't do anything with the deck. Fortunately I was able to catch up on inside work on Friday / Saturday and catch up on a nap on Sunday. I'm hoping that this Friday will be dry so that I can wrap things up on the deck.
We hadn't hung pictures since moving in and we spent a good bit of time on Saturday morning figuring out where most of the artwork was going. I then spent several hours hanging them. I still have more to go, but it's nice not having piles of art stacked up.
Good news - The Phillies won the NL East pennant this past weekend! My condolences to my upstate NY (Mets) friends.
Saturday, September 27, 2008
Rainy Weekend
It's been a wet rainy weekend so far. I've got one day of work left to get the step railings on and skirt board done, but it doesn't look like that is going to happen today. I'm going to do some indoor jobs today - hanging pictures and organizing the basement.
I got my iMac back from the repair shop yesterday. They had diagnosed it as a bad power supply. Here's hoping everything is back to normal!
Saturday, September 20, 2008
Back to work!
We've had friends from NY visiting for the last several days, here to celebrate my oldest daughters sixteenth birthday. It was good getting caught up with the news from up north. It's still hard to believe that I have a sixteen year old.
I got back out to the deck this afternoon, and got to work attaching the Azek skirtboards. By 7 o'clock, we had all the skirtboards attached. My dad came over for several hours and had some good tips on better ways to do things. I also borrowed his radial arm saw to cut the 12" wide skirt boards. My chop saw can't cut much deeper than 8", so having the extra reach with the radial arm was a great advantage.
At this point, all I have left is to get the skirt boards onto the side of the steps, install the step railings, and some cleanup activities. It's good to be almost done!
On the computer front, the Apple store was not able to reproduce the problem I was having after two days of testing. The computer came home on Wednesday, and the problems started again on Thursday. I took the computer back today. Fortunately, the store showed me where the loading dock was, so I won't have to carry the PC through the mall again. The good news - they were able to reproduce the problem today, so hopefully they'll be able to figure out soon.
One cool thing on the work front, my department will be doing a 3 month trial of 4-10 hour days. This will give me every Friday off! We'll be starting this upcoming week.
Til' next time. . .
I got back out to the deck this afternoon, and got to work attaching the Azek skirtboards. By 7 o'clock, we had all the skirtboards attached. My dad came over for several hours and had some good tips on better ways to do things. I also borrowed his radial arm saw to cut the 12" wide skirt boards. My chop saw can't cut much deeper than 8", so having the extra reach with the radial arm was a great advantage.
One cool thing on the work front, my department will be doing a 3 month trial of 4-10 hour days. This will give me every Friday off! We'll be starting this upcoming week.
Til' next time. . .
Saturday, September 13, 2008
Loss of Momentum
I got off to a late start on Saturday morning, having slept in after being awake for part of the night. By the time I got started, it was close to 10 am. Since returning from vacation, I haven't spent any time on the deck project. Work has been busy and I spent 16 hours at work on Thursday working on a problem. Between work and getting things back to normal at home, I haven't been terribly motivated to get back to work on the deck. It was a good thing my Dad was headed over, otherwise I may never had started.
I had thought getting the steps done would be a half day affair. This was an underestimate as things took longer than I had expected. There were a lot of small details to work out, such as how to attach the treads to the risers. I wound up screwing down the back of the rear tread, then using the CONCEALoc fastener between the two boards, and then screwing down the leading edge of the front tread.
As the front treads are not pre-grooved, I had to cut a slot for the hidden fasteners. I spent a bit of time looking for my biscuit jointer in the few unpacked boxes in the basement and am beginning to think that the biscuit jointer "disappeared" in the move. We've already discovered several things that went missing during the move by United Van Lines including a chain saw. Unfortunately I already filed my claim with them and will not get reimbursed for any additional items I find are missing.
By the end of the day, we had all of the start treads attached, the first Azek skirt board cut down and attached, and the Azek for the stair risers cut down.
What's left? Two things: 1) The stair railings and 2) the remaining white skirt boards around the outside of the deck.
I had thought getting the steps done would be a half day affair. This was an underestimate as things took longer than I had expected. There were a lot of small details to work out, such as how to attach the treads to the risers. I wound up screwing down the back of the rear tread, then using the CONCEALoc fastener between the two boards, and then screwing down the leading edge of the front tread.
As the front treads are not pre-grooved, I had to cut a slot for the hidden fasteners. I spent a bit of time looking for my biscuit jointer in the few unpacked boxes in the basement and am beginning to think that the biscuit jointer "disappeared" in the move. We've already discovered several things that went missing during the move by United Van Lines including a chain saw. Unfortunately I already filed my claim with them and will not get reimbursed for any additional items I find are missing.
By the end of the day, we had all of the start treads attached, the first Azek skirt board cut down and attached, and the Azek for the stair risers cut down.
Thursday, August 28, 2008
Gone Fishin
Saturday, August 23, 2008
The bricks have landed. . .
My son was not feeling well today and spent the better part of the day in bed. My dad came by around 9 AM and was a great help. Thanks Dad!
The morning started off by leveling the first course of bricks. I had purchased two pieces of 1/2" black pipe last night to screed the sand and make everything level. After placing the first course of retaining wall, I filled in with crushed stone.
Once the details were set, we set up in the garage and started cutting the stringers. Had to go to Lowe's to get a 2x12 when I found that one of the lumberyard stringers was cracked beyond use. I had to cut my own stringers because the store bought stringers didn't have enough rise to reach the deck from the ground. A second advantage was that my stringers are attached under the deck instead of hanging a second piece of wood under the joist to catch the stringer. It looks a whole lot better in my opinion.
We decided to call it quits once the stringers were in place. I'm behind schedule from where I wanted to be at this time, but I'm meeting another one of my goals - enjoying the summer. Despite being behind, I'm feeling good about the progress and don't want to rush the finish details.
Thursday, August 21, 2008
In the category of "it's taking longer than it should. . . "
At the bottom of the steps, I am creating a brick landing for folks to step off onto. As I mentioned before, the ground is sloped where the steps hit the ground. A level pad would ensure that folks wouldn't lose their balance at the bottom of the steps.

This past Saturday I purchased the bricks for the pad - (48) 4" x 8" bricks which would form a 32"x48" landing. As I started last night, I realized just how much the ground sloped: about 12" from front left corner to right rear. Clearly I was not going to be able to build up dirt around the pad as I had first intended. Back to Lowes where I purchased (11) 4"x8"x12" wall blocks. My plan is to build a wall on the rear and right side, fill in the middle with rock then sand, then place the brick pavers on top.
Our soil is dense clay and we spent the better part of the night excavating the hole. The soil was so hard we had to use a 5' iron breaker bar to break up the soil. After we had the hole to the right depth, we started filling the footers for the wall with crushed rock we got from a neighbor. We then created our sand bed which I started to level. I test fit three bricks but found them slightly out of level, so I'll get some pipe on my way home tomorrow to screed the sand.
Taken from the deck
Tuesday, August 19, 2008
Hardware store to the rescue
It's been a slow couple of days with respect to deck building. Actually, there has been no deck building going on in the last couple of days. Sunday we went to church and then spent the afternoon with my folks.
I went to the hardware store today to return a couple of unused items and to work out the exchange of the Azek trim. I had received 10" material but realized that 12" material was needed to cover the edges of the TimberTech planks. I'm covering the ends of the boards as they are grooved to accept the hidden fasteners.
While there, I got two packages of extra Radiance Rail fasteners that I needed (see previous post). The good news was that they had the package in stock even if each package of four cost $18. The person I was working with said that the TimberTech material has gone up in price since I purchased it, and is going to go up another 7% due to high demand and cost of materials.
I hope to start working on the brick pad for the steps tomorrow night. The dog will be happy about this as she found the 40" leap a bit to high to her liking (after she jumped).
Monday, August 18, 2008
Called TimberTech regarding mounting brackets
Because I am splitting an eight foot section of radiance rail into two four foot sections, I needed four additional mounting brackets. These brackets attach the upper railing to the vertical support posts. The company representative said I'd have to go to the dealer/lumberyard to order more mounting hardware. They don't sell or ship to a non-dealer.
Bummer.
Saturday, August 16, 2008
Railings - the sequel
Today we got done all the railings installed with the exception of the steps! It feels really good to have the deck closed in. We used one 8' package of radiance rail to create two 4' sections of railing. The only problem with this is that TimberTech does not include enough mounting hardware for two railing sections. We improvised to get things completed. Still, I'm going to call TimberTech on Monday to see if I can get some additional hardware as I'm planning to cut another 8' section in half for the steps.
After the railing went up, we started laying the groundwork for the steps by cutting the planks into 4' lengths.
Due to other chores needing attention around the house, we quite the deck work mid-afternoon. Before we quit we brought the patio table and umbrella up onto the deck to see how things looked. The table fits well into the bumpout.

Friday, August 15, 2008
No Rain!
The weather guessers were wrong. What was predicted to be a washout today was actually 5 minutes of sprinkles around 4 PM. The result was five more sections of railing put up.
Thursday, August 14, 2008
Working the Railings
The weather has not been great as of late. I took the sunrise picture on Sunday morning. Red sky in morning, sailors take warning goes the saying. Or maybe it should be deck builders take warning.
Tonight was smooth sailing and the third railing section was installed in about an hour. Once we installed the third section, the skies were threatening and I had to break down. It started raining almost immediately after we got things in.
I have tomorrow off. Hopefully the weather will cooperate enough to get work done. Three sections done, nine to go.
Some tips if you are installing TimberTech's Radiance Rail:
- My lumberyard recommended using rough cedar for posts because they have seen pressure treated material crack the post covers.
- Start with a rail section that will give you a good size piece of leftover piece of top and bottom rail. Use the scrap rails to test fit the rail to post joint. This will allow you to determine the angles to cut the rails, leaving a tight joint between the rail and the post. Generally I had to cut the rail either a half or whole degree one way or another.
- As you get more scrap pieces of railing, mark the scraps with the angle they are cut at. This will allow you to quickly figure out what angle you need to cut the rails at.
- Cut your rails slightly long, check, then trim an 1/8" off the rail. Repeat this process until you have reached the correct length. The top and bottom rails should be very tight to the posts to have a tight joint.
- Work hard to ensure your posts are plumb. If your top and bottom rail are different lengths, your posts are not plumb.
Hopefully I'll have lots of pictures tomorrow.
Saturday, August 9, 2008
Deck Planks are on, trimmed, and retrimmed.
The morning started with a dilemna. I had three boards to attach. Unfortunately the deck was 3 boards plus an extra inch deep. I kicked around several different options. I decided to take off the rim joist, cut an inch of each of the joists at the edge of the deck, and reattach the rim joist. It took about two hours.
Some folks start attaching planks at the edge of the deck and work their way towards the house so that they will have a full width board at the edge of the deck. Esthetically, I can't disagree with this approach. I didn't do this as I didn't want a sliver of a plank at the house. I also knew my deck was square and parallel. Fortunately for me it worked out that I have full width boards at the house and at the edge of the deck.
My son couldn't wait to get the post sleeves on the posts and put all the caps on. Each one will have to come off to get cut down to 39.5". Still, I'm glad he did it.

By this point, we were ready to start attaching the railings. We had accumulated quite a bit of stuff on the deck by this point, so we did some clearing. I've been throwing all my tools in the trailer of my riding mower. It's getting pretty full by now. We then laid out the tools that we needed to start attaching the railings.
The first section of railing always goes up the slowest. Getting the right tools and understanding the right order of things slows things down, even if I have used this product before. We were determined to get one section done before we quit for the evening. We got this first section done after dinner and cleaned up around 7 pm. One section down, eleven to go!

Friday, August 8, 2008
Great Customer Service. . .
I woke up at 3 am today. This is early, even for me. I've been having some tendonitis in my left arm lately, and I forgot to take some Advil before I went to bed. I must have laid on my arm because it was sore and woke me up.
While we waited for the material to finish up the bump-out, we moved to the house side and wrapped up the inside 2 foot section. There was some cutting and tweaking involved, so we took our time here. Once we got this section done, we started trimming the board edges with the circular saw. Fortunately I noticed that one CONCEALoc fastener was hanging slightly over the edge of the joist before I started cutting. This would have wrecked the circular saw blade I had just purchased to cut the deck edges. I had to attack this with a jig-saw and a metal cutting bit. Actually 2 metal cutting bits, the fasteners are pretty tough stuff.
Wednesday, August 6, 2008
Four Day Recap
This past Sunday was a beautiful day, low 80s, low humidity. We went to church in the morning. In the afternoon, I took a nap. A nice long nap. I didn't do anything on the deck except sit on it. It was a great day of rest.
Monday evening, my son and I worked on the deck attaching more deck planks.
Tuesday night, it rained cats and dogs.
Tonight, my son and I attached another two posts and built the deck out to the edge of the posts in the main section of the deck. We have one more board to connect on the outside of the posts tomorrow night.
The two foot deep section by the house.
and the 4' deep section in the bumpout. This area starts at 20' wide and narrows to 12' wide. There will be no butt joints in either of these two sections so the work should go quicker than the main portion of the deck.
I've got Friday off, so what we don't get done tomorrow night, we'll complete on Friday. After that we'll trim the edges of the planks to be flush with the joist edges and then move on to the Radiance Rails.
Saturday, August 2, 2008
Walk the plank(s). . .
It was a good day today in between and after the rainstorms. I got started around 8 am with attaching more planks. This continued throughout the day. Twice we had to quickly throw all the tools into the riding mower's trailer and pull them into the garage when heavy rain rolled in. Fortunately as quick as the rain came in, it blew out. Both times I mopped the excess water off the deck, the sun dried things out, and we were back to work within an hour of pulling things off the deck.
As is becoming a good Saturday tradition, my Dad came over to supervise, this time with my Mom as well. The day pretty much consisted of attaching the planks to the deck. Work around the steps slowed things a bit, but by the end of the day the main part of the deck is about two thirds complete. We knocked off at 5 pm for a steak dinner.
Friday, August 1, 2008
As expected, I woke up before 5 am this morning. After having my cup of coffee and sorting through some emails, I got to work on figuring out step details. On my last deck project in NY, the steps took way longer than they should have. Using Google's free Sketch-Up CAD software, I was able to draw up the details I needed in about a half hour. It's a pretty amazing tool.
We had a scheduled visit from the plumbing company to fix a problem with the master bath tub. When the master toilet was flushed, it would suck the water out of the tub's drain line and allow septic gases into the house. It turns out that it was plumbed wrong and didn't vent the tub properly. Unfortunately, they had to cut several holes in our kitchen ceiling to fix the problem. The builder's handyman will be coming next week to do the drywall. This is going to be a tough drywall job as it is in the kitchen ceiling and will be easily seen if not done well.We then started attaching the planks. I came up with a way to pull the boards together by using an 18" piece of 1/2" pipe, a Bessey Pipe clamp from Lowes, and two metal trusses screwed to a 2x4. This setup worked so well that we went out and got a second pipe clamp from Lowes. Precut and threaded 1/2" pipe - $3, 2 Trusses - $4, Clamp - $12. About $40 for the two clamps. The CONCEALoc fasteners are working well now that we have a method to seat the planks onto them.
We got several courses of planks attached before we broke for dinner with wife's sister and family. I continued on after dinner.

Thursday, July 31, 2008
Working the Pile of Planks
This has been a long week at work, I haven't been sleeping well, and consequently I'm feeling a bit fatigued today. The good news is that I have off from work tomorrow! While most normal people are able to sleep in on their day off, I find that I wake up at the same time or earlier than I do when I have to go to work. Hopefully I'll be able to sleep a bit later tomorrow morning.
Tonight, my son and I loaded deck planks onto the deck. We also trimmed all the ends and re-oriented the planks that I had loaded onto the deck this past Saturday. The picture below shows how I attached the chop saw to the edge of the deck. This set-up worked well and was an idea of my dads.
Subscribe to:
Posts (Atom)
